model: BS6250iE
![TÜV rheinland](http://china-bison.com/wp-content/uploads/2023/12/TUVRheinland.png)
![](http://china-bison.com/wp-content/uploads/2023/12/ce.png)
![rohs compliant](http://china-bison.com/wp-content/uploads/2023/12/rohs-compliant.png)
![epa](http://china-bison.com/wp-content/uploads/2023/12/epa.png)
5kw home backup inverter generators with CO shield
within 25 days delivery time after receiving the deposit!
5kw home backup inverter generators with CO shield come from a leading manufacturing company, BISON, who provide high performance, reliable home backup power. The inverter technology ensures the generator produces clean electricity, making it safe for sensitive electronic devices while being quieter and more fuel efficient than conventional generators. The built-in CO shield is an important safety feature that detects dangerous carbon monoxide levels and automatically shuts down the generator when needed, preventing the risk of poisoning.
![video-background](http://china-bison.com/wp-content/uploads/2023/12/video-background.jpg)
features
![](http://china-bison.com/wp-content/uploads/2024/12/5kw-home-backup-inverter-generators-with-co-shield-feature.jpg)
BISON 5kw home backup inverter generator weighs approximately 42.5 kg (121 lbs.). Its space-saving design makes it easy to transport and store. This generator comes with a wheel kit and a foldable handle for added convenience.
With a powerful 5.0 kW rated output and 5.5 kW peak power, this generator uses pure sine wave technology to provide stable AC output, suitable for a wide range of appliances and electronic devices.
This generator is powered by a 224cc ohv four-stroke engine with a noise level range of 52-67 dB for quieter operation. It offers a variety of convenient starting options including electric, recoil and remote start.
The fuel tank capacity is 11 liters (3.4 gallons) and provides up to 13 hours of run time at 25% load, making it both efficient and reliable for extended use.
![](http://china-bison.com/wp-content/uploads/2024/12/5kw-home-backup-inverter-generators-with-co-shield-feature-2.jpg)
specifications
output | |
Rated power | 5.0 KW |
Maximum power | 5.5 KW |
Phase | Single-phase |
AC voltage | Depends on your country’s voltage |
Single-phase AC amperage | Running power ÷ Using voltage |
DC USB output | 5V/1A/2.1A |
Frequency | 50 / 60 HZ |
Noise level | 67dB with 7M |
100% load continuous operating time | 4.0 H |
engine & emission | |
Engine type | 1-cylinder, 4-stroke, air-cooled, veritical |
Engine model name | BS225i-3 |
Bore × stroke | 70 × 58MM |
Engine displacement | 223 CC |
Engine speed | 3000(50 Hz) / 3600(60 Hz) RPM |
Recoil start | Yes |
Electric start | Yes |
Remote control | Yes |
alternator | |
Winding material | 100% copper winding |
Power factor | 1.0 (Single-phase) |
fuel system | |
Fuel tank capacity | 11 L |
Oil capacity | 0.7 L |
package | |
Carton dimensions | 715 × 480 × 640 MM |
Generator net weight | 42.5 KGS |
Carton gross weight | 46.7 KGS |
optional
![ELectric-&-remote-start](http://china-bison.com/wp-content/uploads/2023/12/ELectric-Remote-Start.jpg)
The open type inverter generators above 3 kilowatts should choose this option.
electric & remote start
easy to start the generator
![Industrial-socket](http://china-bison.com/wp-content/uploads/2023/12/Industrial-Socket.jpg)
The generators above 5 kilowatts or have three-phase voltage should choose this option.
industrial socket
power for industrial use
![ATS](http://china-bison.com/wp-content/uploads/2023/12/ATS.jpg)
When you take generators as backup power, you could choose this. ATS is not necessary for small kilowatts.
ATS
automatically start without human intervention required
![](http://china-bison.com/wp-content/uploads/2024/12/dual-fuel.jpg)
When you would like the generators use gasoline or LPG that you can choose this optional
Dual fuel
Double fuel with ECO
![](http://china-bison.com/wp-content/uploads/2024/12/parallel-connection.jpg)
When you would like the power more than 10 kilowatts, you could choose this. It is not necessary for small kilowatts.
parallel connection
Bigger power more than 10.0 kilowatts
factory
overview
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-factory.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-parts-checking.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-parts-warehouse.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-production-line.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-raw-material-checking.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-shipment.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-stock.jpg)
![](http://china-bison.com/wp-content/uploads/2024/12/inverter-generator-warehouse.jpg)
how we test the inverter generator
![](http://china-bison.com/wp-content/uploads/2024/12/cylinder-head-checking-1-768x576.jpg)
Ensure no air leaks from cylinder head.
cylinder head checking
![](http://china-bison.com/wp-content/uploads/2024/12/crankshaft-torque-2-768x576.jpg)
Ensure the crankshaft installation with correct angle.
crankshaft torque
![](http://china-bison.com/wp-content/uploads/2024/12/remarks-for-camshaft-768x576.jpg)
Ensure correct operation with next step.
remarks for camshaft
![](http://china-bison.com/wp-content/uploads/2024/12/crankcase-quality-testing-768x576.jpg)
Ensure crankcase with strong thickness.
crankcase quality testing
![](http://china-bison.com/wp-content/uploads/2024/12/intake-exhaust-valves-gap-1-768x576.jpg)
Ensure the correct gap between intake and exhaust valves.
intake & exhaust valves gap
![](http://china-bison.com/wp-content/uploads/2024/12/air-tightness-test-2-768x576.jpg)
Ensure the sealing of the engine is stable.
air tightness test
![](http://china-bison.com/wp-content/uploads/2024/12/gap-of-alternator-2-768x576.jpg)
Ensure the inverter is in correct position.
checking & adjustment the inverter position
![](http://china-bison.com/wp-content/uploads/2024/12/testing-speed-2-768x576.jpg)
Ensure the correct speed and power of engine.
testing speed
![](http://china-bison.com/wp-content/uploads/2024/12/gap-of-alternator-2-768x576.jpg)
Ensure the gap between alternator and igniter.
gap of alternator
![](http://china-bison.com/wp-content/uploads/2024/12/checking-and-recoil-starter-testing-768x576.jpg)
Ensure no mistake with inside and smoothly with recoil starter.
checking and recoil starter testing
![](http://china-bison.com/wp-content/uploads/2024/12/installing-silent-box-and-checking-inside-again-768x576.jpg)
Ensure no other spare parts inside silent box.
installing silent box and checking inside again
![](http://china-bison.com/wp-content/uploads/2024/12/power-testing-2-768x576.jpg)
Ensure the rated power output.
power testing
![](http://china-bison.com/wp-content/uploads/2024/12/sockets-current-1-768x576.jpg)
Ensure sockets has rated current output
sockets current
![](http://china-bison.com/wp-content/uploads/2024/12/strengthen-testing-2-768x576.jpg)
Ensure all generators are working powerful before the package.
strengthen testing
![](http://china-bison.com/wp-content/uploads/2024/12/checking-weight-2-768x576.jpg)
Ensure no parts miss before the package
checking weight
support
warranty
※ Our commitment:
As a leading manufacturer in the power generation industry, BISON not only guarantees that every generator, including the BS6250iE, is manufactured to the highest quality and performance standards, but also provides you with valuable support through comprehensive marketing materials and technical training.
※ Warranty time: 1 year after B/L date.
※ Warranty coverage: Non-human factors, the damage caused by machine its own quality problems.
※ How we fulfill our warranty:
Situation 1 Conveniently replaceable spare parts are damaged within warranty time → We provide new spare parts free of charge and ship them with your next order.
Situation 2 Quality problem with small batches within warranty time: You give your customer a new generator for free → We would give you a discount in your next order corresponding to the amount of the severely damaged generator.
Situation 3 Quality problem with big batches if you buy BISON brand within warranty time: You give your customer a new generator for free firstly → We would send technicians to your country to repair these machines for you free of charge.
Situation 4 Quality problem with big batches if you buy your own brand within warranty time: You give your customer a new generator for free firstly → We would compensate you in batches in future orders.
OEM service
※ Design team size: 10 designers.
※ What can we design for you: sticker, carton, logo, poster…
※ Design time required after receiving your deposit
Sticker design: within 2 days
Carton design: within 2 days
Logo: within 1 day
Poster: within 1 week
……
agent service
※ How to become a BISON agent: achieve orders of more than USD 1 million of BISON brand products in one year.
※ What can you get after becoming an agent:
We will assist you in building a BISON supermarket store locally
Give you free display racks and display cabinets
Provide you with free decoration design services.
……
※ At the same time, enjoy the supreme VIP warranty experience and service!
customs services
※ We can find the cheapest sea shipping price for you.
※ We can find a local customs clearance agent for you.
※ In some special cases, we can save you import tariff costs.
Contact BISON’s Dealer Support team today to learn about our competitive pricing and become an authorized dealer of our quality generator solutions.