120v/240v 60hz 25kva big fuel tank isuzu genset
Are you looking for a reliable power solution that combines efficiency, versatility and durability? 120v/240v 60hz 25kva big fuel tank Isuzu genset from China’s leading professional genset supplier is your best choice.
BISON big fuel tank Isuzu genset is the perfect solution for:
- Genset dealers for construction and industrial applications
- Rental company providing temporary power solutions for events and emergencies
- Businesses and facilities requiring reliable backup power during power outages
- Remote areas requiring sustained and expanded power generation
features
dual voltage (120v/240v)
The 60hz 25kva big fuel tank genset offers ultimate versatility, suitable for powering a wide range of appliances and equipment from homes and offices to workshops and construction sites.
60Hz frequency, designed for optimal compatibility with North American electrical systems, ensuring seamless integration and operation.
With 25KVA capacity, there is enough power to meet the needs of a variety of applications from industrial to residential environments.
big fuel tank
Offers extended run time functionality to minimize the need for frequent refueling and maintain uninterrupted operation for longer periods of time. This is especially beneficial in remote areas or during prolonged power outages.
ISUZU engines are renowned for their durability and fuel efficiency, ensuring reliable power generation and low operating costs.
Work with a genset supplier to get a superior genset that delivers consistent, reliable power whenever and wherever it’s needed.
specifications
output | |
---|---|
rated power | 20 KW / 25 KVA |
voltage | 120 V / 240 V |
frequency | 60 HZ |
Phase / Wire | 3 Phase / 4 Wire |
Power Factor | 0.8 |
engine & emission | |
---|---|
engine type | JE493DB-03 |
type | Water-cooled, inline, 4-stroke, direct injection |
prime power | 24 KW |
intake type | Naturally Aspirated |
no.cylinders | 4 |
bore × stroke | 93 × 102 MM |
displacement | 2.771 l |
100% prime power fuel consumption | 6.5 L/H |
alternator | |
---|---|
brand model | BS184F |
prime power | 20 KW / 25 KVA |
power efficiency | 88.50% |
voltage regulation | ≤ ±1 |
excitation type | brushless |
insulation class | h |
controller | |
---|---|
band | SMARTGEN |
model | HGM6120 |
packaging | |
---|---|
dimension | 2100 × 900 × 1250 MM |
weight | 900 KGS |
optional
When you take genset as backup power, you could choose this.
ATS
automatically start without human intervention required.
You should choose this option when the lowest temperature of the year in which the gensets are used is below 0 ℃.
preheater
helps start genset in low temperature.
If you don’t have specific needs for a controller brand, we would make our recommendations.
controller brand
to control all functions of genset.
You should choose this option if you need more convenient output for a genset below 30kw.
sockets
make genset output more convenient.
If you need to use genset for more than 8 hours a day, you should choose to increase the fuel tank of genset.
larger fuel tank
increase genset’s one-time use time.
If you require more convenient use of the fuel tank, you should choose this option.
separate fuel tank
replaces the bottom fuel tank and is more convenient to use
If the fuel you are using is not of good enough quality, you should choose this option.
fuel-water-separator
remove moisture from fuel and extend engine life
factory
overview
how we test the diesel gensets
We always get genuine and original engines from regular channels.
purchase engine
We always use the most sophisticated cutting instruments to cut sheet metal.
sheet metal cutting
The welding workers have 20+ years of experience and the welding points are flawless.
welding
Professional spray and baking booths are used to color the silent covers.
spray paint
Paste sound insulation cotton with a thickness greater than 3cm on the silent cover.
paste silent cotton
BISON brand brushless AC alternator is made by ourselves
alternator assembly
Connect engine and alternator.
semi finished genset
Establish a connection between the line and the controller.
install controller
Check whether the internal wiring is intact and working.
wiring
Assembling the silent cover after cutting and painting.
soundproof producing
Every genset would be tested in the testing center.
test center
Every genset would be tested for more than 30 minutes.
genset testing
Stick BISON or OEM logo lable.
stick logo
Packed with pearl cotton and stretch film.
packing
Loading is carried out by experienced forklift workers to ensure that every machine is in good condition.
loading
support
warranty
※ Our commitment:
Dear customer, many thanks for considering our generator. We have firm confidence in the quality and performance of our products, so our warranty is more than just an oral promise or a document, it is our commitment to quality. We will work tirelessly to ensure that every generator you own is rigorously tested and carefully manufactured!
※ Warranty time: 2 year after B/L date.
※ Warranty coverage: Non-human factors, the damage caused by machine its own quality problems.
※ How we fulfill our warranty:
Situation 1 Conveniently replaceable spare parts are damaged within warranty time→We provide new spare parts free of charge and ship them with your next order.
Situation 2 Quality problem with small batches within warranty time: You give your customer a new generator for free→We would give you a discount in your next order corresponding to the amount of the severely damaged generator.
Situation 3 Quality problem with big batches if you buy Bison brand within warranty time: You give your customer a new generator for free firstly→We would send technicians to your country to repair these machines for you free of charge.
Situation 4 Quality problem with big batches if you buy your own brand within warranty time: You give your customer a new generator for free firstly→We would compensate you in batches in future orders.
OEM Service
※ Design team size: 10 designers.
※ What can we design for you: sticker, carton, logo, poster…
※ Design time required after receiving your deposit
Sticker design: within 2 days
Carton design: within 2 days
Logo: within 1 day
Poster: within 1 week
……